Speaker: The Cabling Team
Abstract
The team has strategized to fabricate the TFD Rutherford cables in three stages: (1) development cables; (2) prototype cable; (3) production cables (including spares). The prototype cable "W12OL1303" was fabricated between January and March 2022. This seminar documents the experience gained, provides a summary of the fabrication lessons, and discusses improvements to be made before the production cable run.
There will be a brief introduction followed by 8 talks:
0. Introduction (Ian)
1. Incoming Wire Acceptance (Mike)
2. Wire Diameter Inspection (Elizabeth)
3. Pre-cabling Annealing HT (Mike)
4. Respool Log and Hardware (Elizabeth)
5. Alignment (Elizabeth)
6. Startup (Team)
7. Production Run (Team)
8. Summary of Lessons and Action Items (Elizabeth)
Connection: https://lbnl.zoom.us/j/5104867866
Ian Pong